An analyst trained on revision 3 of a method runs it under revision 4. The result is fine. The record isn't. It's one of the most common findings in ISO/IEC 17025 assessments and GMP inspections, and it rarely means anyone was careless. It means the link between document control and training broke somewhere between the QA office and the bench.
What the requirements say
- ISO/IEC 17025 clause 6.2: personnel must be competent, and the lab must authorize staff for specific activities and keep records of that competence.
- ISO/IEC 17025 clause 8.3: documents must be reviewed, approved and current at the point of use.
- GMP (for example 21 CFR 211.25): staff need training in the operations they perform, conducted by qualified people and documented.
7 criteria for SOP change control and training compliance
- Automatic impact analysis on every revision. When an SOP or method changes, you should instantly see which analysts, instruments and active work are affected.
- Training status checked at the point of use. Not just a matrix updated monthly, but a check at the time work is performed, so gaps are caught before a result is reported.
- Training linked to methods and equipment. Authorization should be tied to the specific method revision and, where relevant, the specific instrument.
- Effective-date management. Support for planned effective dates, so training can be completed before a revision goes live.
- Assessor-ready evidence. A training matrix and authorization history you can produce in minutes, with each record linked to the document revision it covers.
- Works with what you already use. Your document control system, LMS or QMS stays the system of record.
- Human authorization, always. Software can flag and draft retraining tasks. Only qualified people should authorize staff.
What it looks like in practice
Materials testing: a revised hardness or tensile method changes specimen conditioning. Every technician who runs that test, on every shift and at every site, needs to see the change and acknowledge it before their next run.
Biopharma QC: an HPLC method revision changes system suitability criteria. Analysts, reviewers and anyone approving results all need current training, and the records must show it.
FAQ
How do you prove training was current when a test was performed?
By linking each technical record to the analyst's training status for that method revision on that date. If you can't show that link, the assessor will ask for it.
Should every SOP change trigger retraining?
Not necessarily. A risk-based approach distinguishes editorial changes from changes that affect how work is done. What matters is that the decision is made deliberately and recorded.
Trucision was built around these criteria. See how it fits your lab or book a 30-minute call.